OSHA Information
>
OSHA Interpretations
Bolting of Joists for Initial Connections is Mandatory Where Required
Controling Contractor Duties Under Subpart R
CPL 2-1.34 Inspection Policy for Subpart R
(clarifies many questions about the standard)
Tag Line Usage
Curing of Mortar Joints in Masonry Walls
Fall Protection for Walking Steel Members That Have Shop-Attached Shear Connectors
When Perimeter Guardrail Cables Must be Installed/Using a Single Perimeter Cable for Tie-Off
Controling Contractors Can Make More Stringent Fall Protection Rules Than Subpart R
Acceptable Uses of Flexble Temporary Electrical Cords on Construction Sites
Electrical Tape Repairs on Cords
Replacing Plugs or Cords on Double Insulated Tools